top of page
PC250087.JPG

SHAYBAH — KSA

NGL INFRASTRUCTURE

SAUDI AMARCO

• Construction of 4 Lift Station Buildings at SHABKHA 111

• RTR Piping for Sewage System / Reject Water at SHABKHA 111 (18 KMs)

• RTR Piping for Raw Water System at SHABKHA 111

• Box Culverts at SHABKHA 56 and SHABKHA 112

• Construction of 23 Rip Rap Swales crossings along with the construction

of approx. 3000LM concrete swales and Catch Basins.

• Dewatering & Shoring

bottom of page