top of page

SHAYBAH — KSA
NGL INFRASTRUCTURE
SAUDI AMARCO
• Construction of 4 Lift Station Buildings at SHABKHA 111
• RTR Piping for Sewage System / Reject Water at SHABKHA 111 (18 KMs)
• RTR Piping for Raw Water System at SHABKHA 111
• Box Culverts at SHABKHA 56 and SHABKHA 112
• Construction of 23 Rip Rap Swales crossings along with the construction
of approx. 3000LM concrete swales and Catch Basins.
• Dewatering & Shoring



















bottom of page